Court Farm, Herefordshire

Benefit from industry leading advice and delivery from a local and experienced installer
Talk to usGet Your Free Quote

Court Farm, Herefordshire

Court Farm Herefordshire solar panels
Court Farm Herefordshire SMA inverter
System Size 221kWp
Generation 194,560kWh
Solar Panels 869 x 255W REC Peak Energy
Inverter 12 x SMA STP-20000 TL EE
Mounting Schletter

No stranger to renewable energy, our client had already overseen the design and installation of a large anaerobic digester plant at his premises and was encouraged by the successful completion and profitable operation of this plant to look at other renewable options suitable for his farm. Court Farm is very local to us and we were approached with a brief to make best use of his rooftop space on two large poultry units by installing solar pv.

The final design of the system was able to fit just over 220kW of panels on the combined roofspace. With larger systems like this one, the work involved is not just installation; there is close liaison required with the district network operator, in this case Western Power and OFGEM (the Office of Gas and Electricity Markets) which is responsible for paying feed-in tariff for larger renewable systems of over 50kW. Larger renewable systems can also benefit from negotiating their own Power Purchase Agreements with an energy supplier of their choice and we were able to help look for the best deal for our client here as well.

The work has a fixed timescale in which it has to be carried out due to the time limited nature of the network offer and if this deadline is not met, Western Power can withdraw permission to connect the new system to the national grid.

As the proposed roofs are on working farm buildings, the installation had to be planned around the day to day operations which were ongoing. At certain times whilst the panels were being fitted, the noise levels had to be kept low to avoid stressing the livestock, so it was especially important that our schedule was discussed with the client and farm manager before work commenced to ensure continuity.

The rooftop team did a great job in bringing the work in on time and to our high standards and once the paperwork was approved by OFGEM our client is now benefitting from his reduced bills and increased income.

Our Lady’s RC Primary School, Herefordshire

Benefit from industry leading advice and delivery from a local and experienced installer
Talk to usGet Your Free Quote

Our Lady’s RC Primary School, Herefordshire

Our Lady’s RC Primary School, Herefordshire
Our Lady’s RC Primary School, Herefordshire
Our Lady’s RC Primary School, Herefordshire
System Size 30kWp
Generation 25,008kWh
Solar Panels 120 x 250W REC Peak Energy
Inverter 2 x SMA STP-15000 TL
Mounting Solion Sunmount

In common with most schools, the governors are looking for ways to cut the running costs of the premises, particularly energy costs and saw the potential of this roof space.

Support from the local authority and the Diocese of Cardiff saw the project given the go ahead and the installation took place in October 2013. It was hoped to carry out the work during half term, but this was not possible, so with some careful pre-planning the installation was done whilst the children were in school.

Despite a few disruptions in class due to heavy footfalls on the roof during lessons, everything went to plan and the solar panels were generating power for the school within a week.

We later returned to Our Lady’s to address the assembled children and their teachers about renewable energy and how their actions at school level were significant on a wider scale. In the first year of generation, we reviewed the performance of the system and in common with most of the arrays we have installed so far, it has exceeded expectations.

The solar system was financed using a local authority loan which is on track to be paid off in year 6. This leaves the school with reduced electricity bills for the foreseeable future and an additional income for the remaining 14 years or so of the feed-in tariff period.